I have been collecting material for this project, I decided to build a hand pump first, this is the result. It is NOT my design I have used the design shown in Australian Model Engineering issue 200 with a few differences.

As I have a lot of silver soldering to do for the boiler I thought starting with the pump I might get up to speed as these are not as critical to the whole project and can be redone easily if not successful. I still need to practice more.

I changed the design somewhat I used hydraulic piston seal and O rings where the piston cyclinder connects to the valve body.and will feed water to the pump from a external water tank (to be built later).

First test it pumps to 250psi no problems I do have a very slight water leak to fix I think it is my silver solder joint on the valve body more practice needed.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s